Enbridge Waited 2 Months Before Reporting Line 5 Tunnel Equipment Loss
LANSING - Enbridge waited two months to report to the state the loss of some equipment on the bottom of the Straits of Mackinac while conducting geotechnical drilling ahead of the potential Line 5 tunnel project and likely will have to leave the debris until spring 2020. According to media reports this week, Enbridge was



